Dartmouth Cancer Center CT Renovation
Dartmouth Health
Owner:
Architect:
Fleck and Lewis
Value:
$ 0.5 Million
Completed:
March 2026
Delivery:
Construction Management
Building Type:
Healthcare
This project involved the renovation and refresh of the existing CT room, control room, and adjacent spaces in preparation for the new CT unit. Additional scope was added to include expanding the size of the exam room and office. Major work included expanding the in-floor trench going from the control room to the CT unit, new flooring, paint, electrical and fire alarm devices, lighting and casework. The exam room sink required a sanitary pump to move waste water to an existing drain in-lieu of an underslab tie-in.